The following lists all current standard CB6 drawings. Last updated March 2022.

Superseded and obsolete drawings can be found at CB6 Highway Standard Plates – Inactive.

  • Drawing notes: Revision triangles shown on the standard drawings are used to show revisions in the general area of the drawing and may not necessarily show each revision separately. A single revision triangle may identify several changes in the standard drawing. Users should compare the new version of a drawing to the previous version to determine all changes.
  • January 2008 – MicroStation CAD files are no longer available for downloading.

Section 2 drawings – Grade construction

2.3 Drawings – Grading (including intersections and cross-sections)

Drawing No. Drawing Description Revision No. Date
2.3.C22 "T"-Intersection Treatment (Type Ia) (Two-Lane Highway)   Feb/23/93
2.3.C23 Intersection Treatment (Type Ib)  (Two-Lane Highway)   Feb/23/93
2.3.C24B "T"-Intersection Treatment (Type IIa) Main Road Designation RAU-211.8-110   Feb/23/93
2.3.C24D "T"-Intersectional Treatment (Type IIa) Main Road Designation RAU-209-110   Feb/23/93
2.3.C25B Intersectional Treatment (Type IIb) Main Road Designation RAU-211.8-110   Feb/23/93
2.3.C25D Intersectional Treatment (Type IIb) Main Road Designation RAU-209-110   Feb/23/93
2.3.C26B Intersectional Treatment (Type IIc) Main Road Designation RAU-211.8-110   Feb/23/93
2.3.C26D Intersectional Treatment (Type IIc) Main Road Designation RAU-209-110   Feb/23/93
2.3.C27B "T"-Intersectional Treatment (Type IIIa) Main Road Designation RAU-211.8-110   Feb/23/93
2.3.C27D "T"-Intersectional Treatment (Type IIIa) Main Road Designation RAU-209-110   Feb/23/93
2.3.C28B Intersectional Treatment (Type IIIb) Main Road Designation RAU-211.8-110   Feb/23/93
2.3.C28D Intersectional Treatment (Type IIIb) Main Road Designation RAU-209-110   Feb/23/93
2.3.C29B Intersectional Treatment (Type IIIc) Main Road Designation RAU-211.8-110   Feb/23/93
2.3.C29D Intersection Treatment (Type IIIc) RAU-209-110   Feb/93
2.3.C30B Intersection Treatment (Type IIId) RAU-211.8-110   Feb/93
2.3.C30D Intersection Treatment (Type IIId) RAU-209-110   Feb/93
2.3.C31B "T"-Intersection Treatment (Type IVa) RAU-211.8-110   Feb/93
2.3.C31D "T"-Intersection Treatment (Type IVa) RAU-209-110   Feb/93
2.3.C32B Intersection Treatment (Type IVb) RAU-211.8-110   Feb/93
2.3.C32D Intersection Treatment (Type IVb) RAU-209-110   Feb/93
2.3.C33B Intersection Treatment (Type IVc) RAU-211.8-110   Feb/93
2.3.C33D Intersection Treatment (Type IVc) RAU-209-110   Feb/93
2.3.C34B "T"-Intersection Treatment (Type IVd) RAU-211.8-110   Feb/93
2.3.C34D "T"-Intersection Treatment (Type IVd) RAU-209-110   Feb/93
2.3.C56 Major Road Intersection on Four Lane Divided Highway   Mar/93
2.3.C57 Minor Road Intersection on Four Lane Divided Highway   Mar/93
2.3.C58 Major-Minor Road Intersection on Four Lane Divided Highway   Mar/93
2.3.C59 Major "T" Intersection on Four Lane Divided Highway   Mar/93
2.3.C60 Minor "T" Intersection on Four Lane Divided Highways   Mar/93
2.3.C61 Rural Frontage Service Road Intersection on Four Lane Divided Highways   Mar/93
2.3M2 Geometric Guidelines and Paving Limits of Intersecting Roadways at Time of Grading and /or First Stage Paving of Highway

2

Mar/07

2.3M3 Geometric Guidelines and Paving Limits of Farm (Residential) Accesses at Time of Grading and or First Stage Paving of Highway

2

Mar/07

2.3M3A Geometric Guidelines and Paving Limits of Field Accesses at Time of Grading and /or First Stage Paving of Highway  

Mar/07

2.3.M4 Approach Treatment for Major Intersecting Roadways

1

Jan/99

2.3.M5 Approach Treatment for Minor Intersecting Roadways

2

Mar/31/06

2.3.M5A Approach Treatment for Minor Access to Low Volume Rural Roads (Design Speed 1

Jan/2021

2.3.M21A Log Haul Intersection Type 1 Right Turn from Minor Road  

Jan/93

2.3.M21B Log Haul Intersection Type 2 Left Turn from Minor Road  

Jan/93

2.3.M21C Log Haul Intersection Type 3  

Jan/93

2.3.M21D Log Haul Intersection Type 4a  

Jan/93

2.3.M21E Log Haul Intersection Type 4b  

Jan/93

2.3.M21F Log Haul Intersection Type 5a  

Jan/93

2.3.M21G Log Haul Intersection Type 5b  

Jan/93

2.3.M21H Log Haul Intersection Type 5c   Jan/93
2.3.M21I Log Haul Intersection Type 6   Jan/93
2.3.M30 Proposed Staged Construction for Traffic Accommodation

1

Mar/87

2.3.M34B Roadside Turnouts on Recreational Roads  

Jul/91

2.3.M39 Ditch Block   Nov/86
2.3.M46 Temporary Pipeline Crossing for Haul Road   May/83
2.3M47A Median (Concrete Curb, Asphalt Surface) 3 Mar/31/06
2.3.M56 Typical Cross-Section for Grade Widening 3 Dec/00
2.3.M57 Typical Cross-Section for Grade Widening for Offset Guardrail   Jul/95
2.3.M58 Typical Cross-Section for Sideslope Improvement 1 Apr/98

2.4 Drawings – Culverts

Drawing No. Drawing Description Revision No. Date
2.4M1 Culvert Installation (Open-Cut Method) 1 March 31, 2022
2.4.M2 Typical Reinforced Concrete Pipe Installation Through Side Entrances   May/79
2.4.M3 Typical Reinforced Concrete Pipe Installation (Rubber Gasket Joint)   May/79
2.4.M5 Typical Cross-Section of Reinforced Concrete Pipe Culvert Installation for Median Drainage   Apr/79
2.4.M6 Typical Cross-Section C.S.P. Median Drain Inlet 1 Jan/99
2.4.M8 Typical Cross-Section C.S.P. Installation for Median Drainage   Apr/79
2.4M9 Details of Standard Sloped End Sections for Plastic Culverts 3 March 31, 2022
2.4.M14 Typical Reinforced Concrete Pipe Installation (Rubber Gasket Joint)   May/79
2.4.M15 Typical Reinforced Concrete Pipe Installation   May/79
2.4.M18 Culvert Installation By Trenching   Jun/95
2.4.M19 Culvert Installation By Coring and Trenching   Jun/95

2.5 Drawings – Riprap

Drawing No. Drawing Description Revision No. Date
2.5M1 Hand-Laid Riprap (Rock or Sacked Material) 1 March 31, 2022

2.7 Drawings – Underground electrical conduits

Drawing No. Drawing Description Revision No. Date
2.7.M1 Details of Underground Conduit Installation   Mar/79
2.7.M2 Typical Electrical Conduit Installation   Dec/84

2.10 Drawings – Manholes, inlets and catch basins

Drawing No. Drawing Description Revision No. Date
2.10.M1 Storm Drain Grate (600 mm x 900 mm - Storm Drain Inlet) 2 Feb/85
2.10.M2 Concrete Storm Drain Inlet (Std. 1.2 m - 600 x 900 mm Opening) 1 Feb/87
2.10.M3 Concrete Storm Drain Inlet 1200 mm Rubber Gasket Reinforced Concrete Pipe 1 Feb/85
2.10.M4 1200 mm Diameter Precast Concrete Sump Drain 1 Dec/86
2.10.M5 Storm Drain Grate (for 600 x 900 mm Opening - Linear Bars)   May/79
2.10.M6 Storm Drain Inlet (900 x 1200 mm Opening - 1.4 m Height) 1 Dec/86
2.10.M7 Storm Drain Grate (900 x 1200 mm Opening - Linear Bars) 1 Feb/85
2.10.M8 Concrete Storm Drain Inlet 600 x 900 mm Opening (Cast in Place) 1 Feb/85
2.10.M9 1200 mm Diameter Precast Concrete Manhole 1 Feb/85
2.10.M10 Concrete Storm Drain Inlet (900 x 1200 mm Opening) 1 Dec/86
2.10.M11 Storm Drain Grate (900 x 1200 mm Opening - with Cross Bars) 1 Feb/85
2.10.M12 Concrete Storm Drain Inlet (Std. 1.2 m Height - 600 x 900 mm Opening) 1 Feb/85
2.10.M14 Precast Reinforced Concrete Manhole (1050 mm Diameter)   Jun/94
2.10.M15 Storm Drain Inlet (Std. 1.2 m Height - 600 mm x 900 mm Opening) 1 Feb/85
2.10.M17 Detail of Catch Basin with Side Inlet Frame and Cover 1 Feb/85
2.10.M18 Types of Trench Bedding and Backfill for Storm Sewer   May/81
2.10.M20 Precast Reinforced Catch Basin Manhole (1050 mm Diameter) 2 Dec/86
2.10.M21 Precast Reinforced Concrete Manhole 1 Feb/85
2.10.M22 Typical C.S.P. Manhole for Sewer Larger than Riser 1 Feb/85
2.10.M23 Precast Reinforced Concrete Storm Drain Inlet Frame and Cover (1220 mm Diameter) 1 Apr/85
2.10.M24 Precast Reinforced Catch Basin Manhole (1050 mm Diameter)   Jun/94
2.10.M25 Storm Drain Inlet Frame and Grate 1 Oct/86
2.10.M26 Storm Drain Inlet Frame and Grate 1 Oct/86
2.10.M26A Storm Drain Inlet Frame and Grate (AT and U Embossed)   Feb/88
2.10.M27 Manhole Frame and Solid Cover 1 Oct/86
2.10.M27A Manhole Frame and Solid Cover (AT and U Embossed)   Feb/88
2.10.M28 Precast Reinforced Concrete Storm Drain Inlet (900 mm Diameter) 1 Jun/94
2.10.M29 Storm Drain Inlet Frame and Cover 1 Oct/86
2.10.M30 Precast Reinforced Catch Basin Manhole (1050 mm Diameter) 1 Jun/94
2.10.M31 Precast Reinforced Concrete Manhole (1200 mm Diameter)   Jun/94
2.10.M32 Storm Drain Inlet Catch Basin Frame and Cover for Semi-Mountable Curb   Jun/94
2.10.M32A Detail of Catch Basin with Side Inlet Frame and Cover   Jun/94
2.10 M33 Storm Drain Inlet Manhole Frame and Cover for Semi-Mountable Curb   Jun/94
2.10.M34 Wheelchair Ramp Catch Basin Manhole Cover   Dec/95
2.10.M35 Details of Asphaltic Flume Drain Outlet (Renumbered from 3.11.M14) 1 Oct/98

2.12 Drawings – Fencing

Drawing No. Drawing Description Revision No. Date
2.12.M1 Class "A" Fence 2 Feb/02
2.12.M2 Class "B" Fence 3 Feb/02
2.12.M2A Class "B" Fence (Modified Wire Spacing) 3 Feb/02
2.12.M3 Class "C" Fence 3 Feb/02
2.12.M4 Class "D" Fence 3 Feb/02
2.12.M5 Class "E" Fence  5 Nov 10
2.12.M6 Position of Fencing   May/93
2.12.M7 Class "F" Fence 3 Jan/17
2.12.M8 Class "G" Fence (Class B Fence with Modified Post Spacing) 3 Feb/02
2.12.M11 Class "B" Fencing Details for Using Metal Stays 1 Oct/96
2.12.M12 Median Cable Fence   June/15

2.13 Drawings – Livestock guards

Drawing No. Drawing Description Revision No. Date
2.13.M4 Livestock Guard Range Type 3.05m Width 1 Jul/95
2.13.M5 Livestock Guard Standard Highway Type 4.88m Width 1 Jul/95
2.13.M6 Livestock Guard Standard Highway Type 6.1m Width 1 Jul/95
2.13.M7 Livestock Guard Standard Highway Type 7.32m Width 2 Nov/99
2.13.M11 Livestock Guard Standard Highway Type 9.145m Width 2 Nov/99

2.15 Drawings – Metal bin retaining wall

Drawing No. Drawing Description Revision No. Date
2.15.M1 Metal Bin Retaining Wall - Type II 1 Jul/86

2.18 Drawings – Concrete and/or corrugated steel storm sewer

Drawing No. Drawing Description Revision No. Date
2.18.M1 Storm Sewer Trench Bedding and Backfill 1 Mar/83

2.29 Drawings – Culvert extensions and culvert liners

Drawing No. Drawing Description Revision No. Date
2.29.M1 Plastic Liner Installation and Grouting within Existing Culverts 1 Jan/03

Section 3 drawings – Surfacing

3.4 Drawings – Pavement sections

Drawing No. Drawing Description Revision No. Date
3.4.M1 Typical Half-Section Asphalt Stabilized and Granular Base Course   Apr/81
3.4.M2A Double Seal Coat and Base Course at Intersection of Primary Highway with Secondary Road or Road Allowance 1 Apr/81
3.4.M7 Typical Half-Section for Granular Base Course and Asphaltic Concrete Pavement   Jun/80
3.4.M16 Asphaltic Concrete Pavement and Granular Base Course   Jul/81

3.9 Drawings – Cement stabilized base course

Drawing No. Drawing Description Revision No. Date
3.9.M1 Typical Half-Section for Cement Stabilized Base Course and Asphalt Stabilized Base Course   Apr/80
3.9.M3 Typical Plan and Half-Section Cement Stabilized Base Course and Asphalt Stabilized Base Course Farm Entrance   Apr/80

3.21 Drawings – Double seal coat

Drawing No. Drawing Description Revision No. Date
3.21.M1 Typical Plan and Half-Section for Double Seal Coat and Base Course Farm Entrance (Renumbered from 3.11.M3A) 1 Oct/98

3.23 Drawings – Seal coat application

Drawing No. Drawing Description Revision No. Date
3.23.M1 Seal Coat Application at Intersections (Two-Lane Highways)   Jun/94
3.23.M2 Seal Coat Application at Intersections (Four-Lane Divided Highways)   Jun/94

3.35 Drawings – Crack repair: mill and fill

Drawing No. Drawing Description Revision No. Date
3.35.M1 Crack Repair Detail Mill and Fill  2  Dec/02

3.50 Drawings – Asphalt concrete pavement

Drawing No. Drawing Description Revision No. Date
3.50.M1 Typical Cross-Section for Asphaltic Concrete Pavement (Renumbered from 3.11.M1) 2 Oct/98
3.50M2 Paving Limits of Intersecting Roadways at Time of Final Paving or Pavement Rehabilitation of Highway 2 Mar/07
3.50M3 Paving Limits of Farm (Residential) Accesses at Time of Final Paving or Pavement Rehabilitation of Highway 2 Mar/07
3.50M3A Paving Limits of Field Accesses at Time of Final Paving or Pavement Rehabilitation of Highway   Mar/07
3.50.M16 Transverse Pavement Joints 1 Oct/98

3.52 Drawings – Milled rumble strips

Drawing No. Drawing Description Revision No. Date
3.52.M1 Continuous Milled Rumble Strips for Shoulders 11 Sept 10/21
3.52.M3 Milled Rumble Strips for Stop Conditions 5 Sept 10/21
3.52.M4 Milled Rumble Strips for Centreline 7 Sept 10/21
3.52.M5 Milled Edge Line Rumble Strips with Continuous Pattern 2 Sept 10/21
3.52.M6T Milled Edge Line Rumble Strips with Gap Pattern
(0.2 m ≤ Shoulder Width
3 Sept 10/21
3.52.M7T Milled Edge Line Rumble Strips with Gap Pattern
(0.6 m ≤ Shoulder Width ≤ 1.5 m)
3 Sept 10/21
3.52.M8T Milled Edge Line Rumble Strips with Gap Pattern (Shoulder Width > 1.5 m) 3 Sept 10/21
3.52.M9T Milled Edge Line Rumble Strips with Gap Pattern (Roadway Width   Sept 10/21

Section 4 drawings – Miscellaneous

4.1 Drawings – Asphalt curb, medians, traffic islands and flumes

Drawing No. Drawing Description Revision No. Date
4.1.M5 Standard Asphaltic Sign Island (60m of 50:1 Taper)   Sep/79
4.1.M6 Typical Half-Section Asphaltic Concrete Pavement with Asphaltic Drainage Curb 2 Feb/85

4.2 Drawings – Concrete curbs, gutters, sidewalks, medians and traffic islands

Drawing No. Drawing Description Revision No. Date
4.2.M15 Pipeline Protection Slab   Aug/98
4.2.M16  Precast "F" Shape NCHRP 350 Test Level 3
2
Aug/10/11  
4.2.M31 Concrete Curb and Gutter Through Transition Section of Curves 1 Feb/85
4.2.M43 Standard Concrete Sign Island - with Conduit 2 Feb/85
4.2.M43A Standard Concrete Sign Island - with Conduit 1 Apr/85
4.2.M47 Raised Median (150 mm Curb)   Jun/94
4.2.M47A Median (Concrete Curb, Asphalt Surface) 200 mm Curb 3 Mar/31/06
4.2.M48 Median End Treatment for Concrete Curb Median 2 Mar/85
4.2.M48A Median End Treatment for Concrete Median   Mar/85
4.2.M53 Median End Treatment for Concrete Curb Median 1 Jun/83
4.2.M56 Concrete Median (150 mm Face) 2 Jun/85
4.2.M56B Concrete Median (150 mm Face) - with PVC Crossdrain 3 Jun/85
4.2.M69 Reinforced Concrete Gutter Outlet (1200 mm Wide x 280 mm High)   Oct/80
4.2.M70 Poured In Place Reinforced Concrete Gutter   Sep/80
4.2.M72 Poured In Place Standard Curb and Gutter (150 mm Curb, 380 mm Gutter) 1 Jul/86
4.2.M73 Median End Treatment (Solid Conc. - Bullet Nose on Base Course) 1 May/85
4.2.M73A Median End Treatment (Solid Concrete - Bullet Nose on ACP) 1 Jun/85
4.2.M74 Concrete Curb Median (Earth Fill) - 150 mm Face   Feb/85
4.2.M75 Poured In Place Standard Curb and Gutter 1 Jul/86
4.2.M76 Precast Concrete Curb - (150 mm Parking Curb)   Mar/90
4.2.M77 Precast Concrete Curb (with Drainage Slots)   Mar/90
4.2.M78 Poured-in-Place Concrete Sidewalk   May/88
4.2.M79 Poured-in-Place Concrete Sidewalk - Comm. or Public Crossing   May/88
4.2.M80 Poured-in-Place Concrete Sidewalk - Private Crossing   May/88
4.2.M82 Poured-in-Place Monolithic Concrete Sidewalk Curb and Gutter (300 mm Gutter) 1 Mar/85
4.2.M83 Rolled Monolithic Concrete Sidewalk - Curb and Gutter   Mar/85
4.2.M84 Monolithic Concrete Sidewalk - Curb and Gutter (380 mm Gutter) 1 May/88
4.2M86 Concrete Sidewalk Ramp for Wheelchair or Bicycle on Tangent (Type 1) 1 March 31, 2022
4.2M87 Concrete Sidewalk Ramp for Wheelchair or Bicycle on Curve (Type 2) 1 March 31, 2022
4.2.M88 Monolithic Concrete Sidewalk, Curb and Gutter (500 mm Gutter) 3 Sept/19/11
4.2.M89 Poured in Place Standard 150 mm Curb and 500 mm Gutter 3 Sept/19/11
4.2.M90 Rolled Monolithic Concrete Sidewalk, Curb and Gutter (500 mm Gutter) 3 Sept/19/11
4.2.M92 Typical Cross Sections Raised Median with Semi-Mountable Curb   Jun/94
4.2.M93 Monolithic Concrete Sidewalk, Curb and Gutter (250 mm Gutter) - Paving Stone Edging   Dec/95
4.2.M95 Sidewalks - Typical Cross Sections   Dec/95

4.3 Drawings – Concrete barrier

Drawing No. Drawing Description Revision No. Date
4.3.M1 Reinforced Concrete Med. Barrier Curb - NJ Shape (610 mm Wide) - with Expansion Joint   1977
4.3.M1A Reinforced Concrete Median Barrier NJ Shape 1 Apr/17/07
4.3.M2 Reinforced Concrete Med. Barrier Curb - F Shape (9 Re-Bars)   May/85
4.3.M2A Reinforced Concrete Med. Barrier Curb - F Shape (6 Re-Bars)   May/85
4.3.M3 Slip-Formed Median Barrier - F Shape 4 Sep/14/07
4.3.M3A Slip-Formed Median Barrier - Half F Shape 1 Sep/14/07
4.3.M4 Transition End Sec. for Reinforced Concrete Median Barrier Curb - F Shape 2 Oct/86
4.3.M5 lsometric View of Transition End Sec. for Reinforced Concrete Median Barrier Curb 2 Oct/86
4.3.M12 Precast Concrete Barrier NJ Shape 1 Apr/17/07
4.3.M14 Plan Showing Dowel and Grout Details - NJ Type   May/85
4.3.M14A Plan Showing Dowel and Grout Details - F Shape   May/85

4.6 Drawings – Toilets

Drawing No. Drawing Description Revision No. Date
4.6.M1 Double Toilet  Drawing Index, Elevations and Vault Details 4 Jan/13
4.6.M2 Double Toilet  Typical Layout Plan 1 and Section 4 Jan/13
4.6.M3 Double Toilet  Typical Layout Plan 2 and Section 4 Jan/13
4.6.M4 Double Toilet  Floor Plan and Section 4 Jan/13
4.6.M5 Double Toilet  Tank Plan and Sections 4 Jan/13
4.6.M6 Double Toilet  Floor Slabs Layout and Sections 4 Jan/13
4.6.M7 Double Toilet  Floor Heating Layout and Section 4 Jan/13
4.6.M8 Double Toilet  Precast Panel A, B, F and G Details 4 Jan/13
4.6.M9 Double Toilet  Precast Panel C Details 4 Jan/13
4.6.M10 Double Toilet  Precast Panel D Details 4 Jan/13
4.6.M11 Double Toilet  Sections, Details and Colour Schedule 4 Jan/13
4.6.M12 Double Toilet  Sections and Details 4 Jan/13
4.6.M13 Double Toilet  Stool Details and Fixture Layout 3 Jan/13
4.6.M14 Double Toilet  Roof Sections 4 Jan/13
4.6.M14A Double Toilet  Roof Framing Plan 3 Jan/13
4.6.M15 Double Toilet  Grid-Power Electrical and Mechanical Layout Plan 2 Jan/13
4.6.M16 Double Toilet  Solar-Power Electrical and Mechanical Layout Plan 2 Jan/13
4.6.M17 Double Toilet  Mechanical Room Section (Grid-Power Electrical) 2 Jan/13
4.6.M18 Double Toilet  Mechanical Room Section (Solar-Power Electrical) 2 Jan/13
4.6.M19 Double Toilet  Solar-Power Container Building Sheet 1 2 Jan/13
4.6.M20 Double Toilet  Solar-Power Container Building Sheet 2 2 Jan/13

Section 5 drawings – Materials

5.10 Drawings – Sampling valve

Drawing No. Drawing Description Revision No. Date
5.10.M1 Detail of Motor Transport Truck Sampling Valve   Jan/80

5.15 Drawings – Supply of corrugated metal pipe

Drawing No. Drawing Description Revision No. Date
5.15.M1 Details of Standard Sloped End Sections for C.M.P. Round Culverts 3 Jul/17
5.15.M2  Details of Standard Sloped End Sections for C.M.P. Arch Culverts 3 Jul/17
5.15.M3 Dimension Details for C.S.P. Arch Culverts   Dec/78
5.15.M4 Coupler Widths and Types to be Supplied with Corrugated Steel Pipe   Oct/78
5.15.M5 Typical Formed-End C.S.P. Coupler   Dec/78
5.15.M6 Lock Seam on Helically Fabricated C.S.P.   Dec/78
5.15.M7 Standard C.S.P. Coupler Connection with Riveted Angle Bracket   Dec/78

5.16 Drawings – Supply of reinforced concrete culvert

Drawing No. Drawing Description Revision No. Date
5.16.M1 Detail of Flared End Section for Reinforced Concrete Pipe Culverts 1 Jan/86

5.28 Drawings – Supply of flexible guide post traffic delineators

Drawing No. Drawing Description Revision No. Date
5.28.M1  (Temporary) U-Channel Post Mounted Delineator (Galvanized Mild-Carbon Steel Type)   Mar/98
5.28.M2 Details of Pavement Edge Delineators (Renumbered from 3.11.M5)   Oct/98

10.6 Drawing – Crack routing and sealing

Drawing No. Drawing Description Revision No. Date
10.6.M1 Typical Cross Sections Crack Routing and Sealing Asphalt Concrete Pavement   Feb/95

Contact

Comments or enquiries can be directed to [email protected].