Notifications

Non-urgent government operations are closed December 24 to January 1, reopening January 2. See the list of services available during this time.

Notifications

Government mail service may be affected by the Canada Post labour disruption. See how to send and receive government mail during this time

Site and infrastructure sub-group

Find documents for earthwork, exterior improvements and utilities.

Division 31 – Earthwork

Section numberSection nameRevision date
31 00 10BEarthwork Testing2018-08-15
31 05 13BFill Materials2018-08-15
31 10 00BSite Clearing2018-08-15
31 20 10BEarthwork General Requirements2018-08-15
31 21 13BRadon Mitigation Rough-in System2024-06-18
31 21 13.03BRadon Mitigation Rough-in System - Alternative Void Space Technology2024-06-18
31 23 10BSite Excavating, Filling and Grading2018-08-15
31 23 16BBuilding and Structure Excavating2018-08-15
31 23 18BRock Excavating2018-08-15
31 23 35BBuilding and Structure Backfilling2018-08-15
31 23 38BTrench Excavating and Backfilling2018-08-15
31 32 13BSoil Cement Base Course2018-08-15
31 62 13BCast-in-Place Concrete Piles2018-08-15
31 62 18BDriven Steel Piles2019-06-05
31 62 19BTimber Piles2018-08-15
31 66 15BHelical Screw Piles2018-08-15

Division 32 – Exterior improvements

Section numberSection nameRevision date
32 11 16BGranular Base2018-08-15
32 12 16BAsphalt Concrete Pavement2018-08-15
32 12 16.01 Pavement Header Detail2008-06-02
32 12 17BAsphalt Concrete Pavement Repairs2010-10-01
32 12 17.01 Pavement Header Detail`2008-06-02
32 13 13BConcrete Paving, Curbs and Gutters2018-08-15
32 13 13.01 Standard Curb & Gutter2018-03-15
32 13 13.02 Sidewalk & Swale Gutter Details2018-03-15
32 13 13.03 Standard Curb2018-03-15
32 13 13.04 Curb Ramp2018-03-15
32 13 13.05 Driveway Detail2018-03-15
32 14 13BInterlocking Concrete Paving Stones2018-08-15
32 17 10BRoad and Parking Appurtenances2018-08-15
32 17 10.01 Street Light Base2008-06-02
32 17 10.02 Metal Car Plug-In Rail2008-06-02
32 17 10.03 Metal Car Plug-In Rail (Hollow Structural Steel Beam)2008-06-02
32 17 10.04 Wooden Car Plug-In Rail2008-06-02
32 17 10.05 Metal Pedestal Plug-In Post2008-06-02
32 17 10.06 Guard Post Detail2008-06-02
32 17 23BPavement Markings2018-08-15
32 31 00BChain Link Fencing2018-08-15
32 31 00.01 Gate Setback Detail2008-06-02
32 31 00.02 Standard Chain Link Fence2008-06-02
32 31 00.03 Typical Chain Link Pedestrian Gate2008-06-02
32 31 00.04 Typical Chain Link Vehicle Gate2008-06-02
32 80 00BIrrigation System2012-06-15
32 91 19BTopsoil Placement and Grading2012-06-15
32 92 19BSeeding2012-07-15
32 92 23BSodding2012-06-15
32 93 00BLandscape Planting2012-06-15
32 93 43BSemi-Mature Trees2010-10-01
32 93 90BInterior Live Plants2010-10-01
32 93 99BInterior Plant Maintenance2010-10-01
32 99 00BExterior Landscape Maintenance2012-11-26
32 99 90BRestoration of Sitework2018-08-15

Division 33 – Utilities

Section numberSection nameRevision date
33 05 10BPiped Utility Systems General Requirements2018-08-15
33 05 10.01 Existing Utility Crossing2018-03-15
33 05 10.02 Valve Chamber Air Release Manhole2018-03-15
33 05 10.03 Piping Cast into Concrete Wall2008-06-02
33 05 10.04 Piping Through Existing Concrete Wall2008-06-02
33 05 10.05 Pipe Bedding Details2008-06-02
33 05 10.06 Typical Service Trench2018-03-15
33 05 10.07 Horizontal Thrust Block Detail2018-03-15
33 05 10.08 Vertical Thrust Block Detail2018-03-15
33 05 23BTunnelling for Utility Crossing Under Highways2008-06-02
33 10 10BWater System2018-08-15
33 10 10.01 Hydrant Installation2018-03-15
33 10 10.02 Valve Installation - Section2018-03-15
33 10 10.03 Valve Installation - Elevation2008-06-02
33 10 10.04 Water Riser & Curb Stop2008-06-02
33 10 10.05 Well Connection Detail2008-06-02
33 30 10BSewer System2018-08-15
33 30 10.01 Precast Manhole2008-06-02
33 30 10.02 Drop Manhole2008-06-02
33 30 10.03 750 mm Catchbasin2008-06-02
33 30 10.04 Manhole Invert on Intersection Less than 90º2008-06-02
33 30 10.05 Server Service Connection2008-06-02
33 30 10.06 Sewer Riser2018-03-15
33 34 05BSanitary Sewage Force Main System2018-08-15
33 34 05.01 Sewage Force Main Flushout2008-06-02
33 46 13BFoundation Drainage2008-06-02
33 50 10BGas Distribution System2008-06-02

Publications

Contact

Connect with Technical Services and Procurement Branch:

Phone: 780-422-7456
Fax: 780-422-7479
Email: [email protected]
Email: [email protected]