Overview
With construction of the twinning of Highway 11 between Rocky Mountain House and Sylvan Lake underway (Highway 11 Twinning Project), the twinning plan (prepared in 2003) through Rocky Mountain House needs to be updated. The study area map shows the study location and limits.
CIMA Canada Inc. (CIMA+) will conduct the functional planning study on behalf of Alberta Transportation and Economic Corridors. The study will:
- assess existing conditions and constraints along the corridor
- identify the concerns and interests of property and business owners within the study area
- investigate feasible twinning and access management alternatives
- update the twinning plan to:
- provide the most appropriate twinning design based on current conditions, constraints and highway design standards
- confirm access management requirements
- identify and address, where possible, the impacts of proposed changes to the corridor, including land, environmental resources, utilities, drainage, and others
- define land requirements
This study will not consider a Highway 11 by-pass around Rocky Mountain House.
A functional planning study is the first step in understanding the needs for any future highway upgrading. Construction of the Highway 11 twinning through Rocky Mountain House is not currently on the provincial construction program.
Study process and timelines
Spring 2024
- Information gathering
- Technical investigations
Summer/Fall 2024
- Alternative development
- Technical analysis
- Preliminary evaluations and pre-screening
- Stakeholder and public engagement
Fall/Winter 2024
- Final evaluations
- Select preferred alternative
Winter 2024/2025
- Develop functional plan
- Stakeholder and public engagement
- Confirm municipal support
- Alberta Transportation and Economic Corridors approval
Benefits
The study will update the 2003 twinning plan for Highway 11 through Rocky Mountain House to reflect existing conditions and constraints and help the Province and the Town understand the potential implications of Highway 11 twinning through the town limits.
Resources
Contact
Connect with us for more information:
Hours: 8 am to 4:30 pm (open Monday to Friday, closed statutory holidays)
René Rosvold, P.Eng., Deputy Project Manager
CIMA+
Phone: 403-775-0100, ext. 7620
Email: [email protected]
For other information about Highway 11, contact Alberta Transportation and Economic Corridors (Central Region):
Phone: 403-340-4867
Toll free: dial 310-0000 before the number (in Alberta)
Email: [email protected]
Address:
4th Floor Provincial Building
4920 51 Street
Red Deer, Alberta T4N 6K8