COVID-19 Updates: Taking steps to return to normal.
- Public health restrictions: Alberta entered Step 2 on March 1.
- Book your vaccine: Albertans 5+ can get it now. Get third dose when eligible.
COVID-19 Updates: Taking steps to return to normal.
Note: The last 2 digits in the ATT Test number indicates the year of the last revision.
Test Number Year Revised | Test Name |
---|---|
BULK ASPHALT CONTENT, Part I, Truck Scale Weight Method | |
BULK ASPHALT CONTENT, Part II, Aggregate Totalizer Method | |
CORING | |
DENSITY, Immersion Method, Waxed Asphalt Concrete Specimens | |
DENSITY, Immersion Method, Saturated Surface Dry Asphalt Concrete Specimens | |
DENSITY, In-Place Balloon Method | |
DENSITY, Calibration of Pressure Gauge (Supplement) | |
DENSITY, In-Place Nuclear Method | |
EXTRACTION, Part I, Reflux | |
EXTRACTION, Part II, Centrifuge Method | |
EXTRACTION, Part III, Correction Factor, Extracted Asphalt Content | |
FORMING MARSHALL SPECIMENS, Field Method | |
MOISTURE CONTENT, Open Pan Method | |
MOISTURE CONTENT, Part I, Oven Method, Soil and Gravel | |
MOISTURE CONTENT, Part II, Oven Method, Emulsified Asphalt Mixes | |
MOISTURE CONTENT, Part III, Cutback Asphalt Mixes, Calcium Oxide Method | |
MOISTURE CONTENT, Part IV, Microwave Oven Method | |
MOISTURE CONTENT, Part V, Oven Method, Asphalt Concrete Mixes | |
PRODUCTION RATE AND PLANT CHECK, Part III, Drum Mix Asphalt Plants | |
PRODUCTION RATE & PLANT CHECK, Part IV, Drum Mix Recycle Asphalt Plant | |
ASPHALT RUBBER BLENDING EQUIPMENT, PRODUCTION RATE and PLANT CHECK, Part V, Drum Mix / Asphalt Rubber Plant | |
PLANT CALIBRATION, Part I, Drum Mix Asphalt Plants | |
PLANT CALIBRATION, Part II, Centre Feed Recycle Drum Mix Plants | |
MOISTURE-DENSITY RELATION, Standard Compaction, +5000 m Material | |
MOISTURE-DENSITY RELATION, One-Point | |
MOISTURE-DENSITY RELATION, Standard Compaction, -5000 m Material | |
SIEVE ANALYSIS, Part I, 80 000 m Minus | |
SIEVE ANALYSIS, Part II - Pit Run Contamination, -5000 m Sieve | |
SIEVE ANALYSIS, 25 000 m Minus | |
SIEVE TEST, Seal Coat Emulsions | |
SOILS IDENTIFICATION, Hand Method | |
TEMPERATURES | |
VISCOSITY, Zahn, Seal Coat Emulsions | |
VISUAL INSPECTION, Asphalt Concrete Formed Specimens | |
VOID CALCULATIONS | |
SAMPLING, Mixes | |
SAMPLING, Gravel and Sand | |
SAMPLING, Asphalt | |
MOISTURE CONTENT, Speedy Moisture Teller | |
CALIBRATION OF AGGREGATE SPREADER | |
CALIBRATION OF ASPHALT DISTRIBUTOR | |
CORRECTION FACTORS, Nuclear Moisture-Density Measurements | |
FLAKINESS INDEX | |
PERCENT FRACTURES, Part I, Minus 20 000 m Aggregate | |
PERCENT FRACTURES, Part II, Minus 80 000 m Aggregate | |
VISUAL INSPECTION, Asphalt Concrete Paving Mixtures | |
UNDISTURBED SAMPLING | |
SIEVE ANALYSIS, RAP | |
DRY STRENGTH, Non-Plastic Aggregates | |
RANDOM TEST SITE LOCATIONS, Part I, Granular Base Course | |
RANDOM TEST SITE LOCATIONS, Part II, Stratified Random Test Sites for ACP | |
RANDOM TEST SITE SELECTION, Part III, Crack Sealing Operations | |
REDUCING SAMPLES TO TESTING SIZE | |
DENSITY, Control Strip Method, GBC | |
DENSITY TEST, Control Strip Method, Granular Fill | |
SMOOTHNESS OF PAVEMENTS, Part I, Manual Profilograph | |
SMOOTHNESS OF PAVEMENTS, Part II, CS 8200 Profilograph | |
SMOOTHNESS OF PAVEMENTS, Part III, ES 2 000 Paveset Profilograph | |
SAMPLING, Slurry Seal Asphalt Mixes | |
AGGREGATE PROPORTIONING | |
MUSKEG TESTING, Bearing Value | |
EMULSION BREAKING POINT | |
DENSITY TEST, ASBC Control Strip Method | |
PERCENT COMPACTION, Asphalt Concrete Pavement | |
APPEAL TESTING, Asphalt Content, Density and Gradation | |
ROUNDING OFF CALCULATED VALUES | |
SAMPLING SALT | |
SALT SIEVE ANALYSIS | |
CRACK SEALING, Measurement of Rout Cross-Section and Sealing | |
IGNITION ASPHALT CONTENT, Part I, Ignition Method | |
IGNITION ASPHALT CONTENT, Part II, Correction Factor | |
IGNITION ASPHALT CONTENT, Part III, Correction Factor for RAP and Virgin Aggregate | |
SAMPLING RUBBER CRUMB | |
INTER-LABORATORY REPEATABILITY TESTING | |
THEORETICAL MAXIMUM SPECIFIC GRAVITY OF BITUMINOUS PAVING MIXTURES |
Was this page helpful?
You will not receive a reply. Do not enter any personal information such as telephone numbers, addresses, or emails.
Your submissions are monitored by our web team and are used to help improve the experience on Alberta.ca. If you require a response, please go to our Contact page.