Manuals

Some Excel files contain a sample worksheet.

All forms are current as of December 2013 unless a more recent revision date is shown in the document.

Any omissions, obvious errors or recommendations for future updates regarding the documents below should be forwarded to ecgfeedback@gov.ab.ca.

Volume 1

Amendments

Forms

Appendix B – Typical Agenda for Consultant Initialization Meeting

Appendix C – Summary Tables of Commonly Used Forms

Appendix D – Planning Requirements

Appendix F – Surfacing Criteria

Appendix G – Supply of Aggregates

Appendix H – Utility Adjustment Agreements (Samples)

  • Sample 1 (DOC, 45 KB) – Letter of Notification
  • Sample 2 (DOC, 47 KB) – Letter Requesting for Cost Estimate
  • Sample 3 (DOC, 55 KB) – Letter of Confirmation of Cost Estimate and Signing Agreements (Telecommunication and Power Company)
  • Sample 4 (DOC, 46 KB) – Letter of Confirmation of Cost Estimate and Signing Agreements (Pipeline Company)
  • Sample 5 (DOC, 69 KB) – Roadway Upgrading Pipeline Crossing Agreement (Pipeline Adjustment is required)
  • Sample 6 (DOC, 55 KB) – Roadway Upgrading Pipeline Crossing Agreement (Pipeline Adjustment is not required)
  • Sample 7 (DOC, 104 KB) – New Roadway over Existing Pipeline Crossing Agreement
  • Sample 8 (DOC, 56 KB) – Letter of Confirmation of Cost Estimate (New Railway Crossing)
  • Sample 9 (DOC, 56 KB) – Letter of Confirmation of Cost Estimate (Existing Railway Crossing Upgrading)
  • Sample 10 (DOC, 46 KB) – Letter of Confirmation of Commencement of Construction
  • Sample 11 (DOC, 50 KB) – Utility Agreement with ATCO Electric Ltd.
  • Sample 12 (DOC, 61 KB) ؘ– Roadway Upgrading Pipeline Crossing Agreement with ATCO Pipeline Ltd. or ATCO Gas Ltd. (with or without Pipeline Adjustment is required)

Appendix I – Sample Cost Estimates and Summary

Appendix J

J1 – Bridge Design Processes and Data Requirements