High Load Corridor

Permit fees help recover the cost of raising overhead utility lines to accommodate high loads on designated Alberta highways.

Overview

The High Load Corridor consists of designated highways that have had the overhead utility lines raised to accommodate loads up to 9 metres high unless noted otherwise.

Government funded the initial corridor construction with the cost recovered from the users of the corridor through permit fees as per the fee table.

Future High Load Corridors

In 2018, we completed a comprehensive, provincewide planning study titled “High Load Corridor Network for Over-size and Over-weight Loads in Alberta”.

The purpose of the study was to take a long term, holistic approach for updating and developing Alberta's High Load Corridor network.

For more information contact:
Stephanie Atkin
Director, Program Support and Implementation
Email: [email protected]
Phone: 780-638-1281

Route segments in service

HighwayBetween (highway or location)And (highway or location)
179736
249688
4Coutts845
936AB/SK Border
91566
11815601
1176122
142117
1583421
1675332
1636Lloydminster
171422 km N. of Jct. 14
19260
211516
2114625
21601625
221A54
2211621
272222 (Sundre)
283663
2936 (Duvernay)36 (West of St. Paul)
321643
35986South of Manning
365399
36945
364529 (Duvernay)
362928
38644Township Road 570
392260
414555
433249 (Valleyview)
453641
4943 (Valleyview)2 (Donnelly)
53Ponoka21
5422761
5563881
5541892
601939
6328North End of Hwy 63
53984536
560Calgary797
5669772
56722772
5972A815
6011121
62122753
625221
64438829
6882986
75316621
772566567
7971560
81559711
825Township Road 552643
829644Jct highway 63 and 28
8312928
8341415
8815563
8454539
98635688
Township Road 570Range Road 22438
Range Road 224825Township Road 570

Contact

Connect with the Central Permit Office:

Toll free: 1-800-662-7138
Phone: 403-342-7138
Email: [email protected]