Site and infrastructure sub-group

Find documents for earthwork, exterior improvements and utilities.

Division 31 – Earthwork

Section numberSection nameRevision date
31 00 10BEarthwork Testing2018-08-15
31 05 13BFill Materials2018-08-15
31 10 00BSite Clearing2018-08-15
31 20 10BEarthwork General Requirements2018-08-15
31 21 13BRadon Mitigation Rough-in System2022-02-14
31 21 13.03BRadon Mitigation Rough-in System - Alternative Void Space Technology2022-02-14
31 23 10BSite Excavating, Filling and Grading2018-08-15
31 23 16BBuilding and Structure Excavating2018-08-15
31 23 18BRock Excavating2018-08-15
31 23 35BBuilding and Structure Backfilling2018-08-15
31 23 38BTrench Excavating and Backfilling2018-08-15
31 32 13BSoil Cement Base Course2018-08-15
31 62 13BCast-in-Place Concrete Piles2018-08-15
31 62 18BDriven Steel Piles2019-06-05
31 62 19BTimber Piles2018-08-15
31 66 15BHelical Screw Piles2018-08-15

Division 32 – Exterior improvements

Section numberSection nameRevision date
32 11 16BGranular Base2018-08-15
32 12 16BAsphalt Concrete Pavement2018-08-15
32 12 16.01 Pavement Header Detail2008-06-02
32 12 17BAsphalt Concrete Pavement Repairs2010-10-01
32 12 17.01 Pavement Header Detail`2008-06-02
32 13 13BConcrete Paving, Curbs and Gutters2018-08-15
32 13 13.01 Standard Curb & Gutter2018-03-15
32 13 13.02 Sidewalk & Swale Gutter Details2018-03-15
32 13 13.03 Standard Curb2018-03-15
32 13 13.04 Curb Ramp2018-03-15
32 13 13.05 Driveway Detail2018-03-15
32 14 13BInterlocking Concrete Paving Stones2018-08-15
32 17 10BRoad and Parking Appurtenances2018-08-15
32 17 10.01 Street Light Base2008-06-02
32 17 10.02 Metal Car Plug-In Rail2008-06-02
32 17 10.03 Metal Car Plug-In Rail (Hollow Structural Steel Beam)2008-06-02
32 17 10.04 Wooden Car Plug-In Rail2008-06-02
32 17 10.05 Metal Pedestal Plug-In Post2008-06-02
32 17 10.06 Guard Post Detail2008-06-02
32 17 23BPavement Markings2018-08-15
32 31 00BChain Link Fencing2018-08-15
32 31 00.01 Gate Setback Detail2008-06-02
32 31 00.02 Standard Chain Link Fence2008-06-02
32 31 00.03 Typical Chain Link Pedestrian Gate2008-06-02
32 31 00.04 Typical Chain Link Vehicle Gate2008-06-02
32 80 00BIrrigation System2012-06-15
32 91 19BTopsoil Placement and Grading2012-06-15
32 92 19BSeeding2012-07-15
32 92 23BSodding2012-06-15
32 93 00BLandscape Planting2012-06-15
32 93 43BSemi-Mature Trees2010-10-01
32 93 90BInterior Live Plants2010-10-01
32 93 99BInterior Plant Maintenance2010-10-01
32 99 00BExterior Landscape Maintenance2012-11-26
32 99 90BRestoration of Sitework2018-08-15

Division 33 – Utilities

Section numberSection nameRevision date
33 05 10BPiped Utility Systems General Requirements2018-08-15
33 05 10.01 Existing Utility Crossing2018-03-15
33 05 10.02 Valve Chamber Air Release Manhole2018-03-15
33 05 10.03 Piping Cast into Concrete Wall2008-06-02
33 05 10.04 Piping Through Existing Concrete Wall2008-06-02
33 05 10.05 Pipe Bedding Details2008-06-02
33 05 10.06 Typical Service Trench2018-03-15
33 05 10.07 Horizontal Thrust Block Detail2018-03-15
33 05 10.08 Vertical Thrust Block Detail2018-03-15
33 05 23BTunnelling for Utility Crossing Under Highways2008-06-02
33 10 10BWater System2018-08-15
33 10 10.01 Hydrant Installation2018-03-15
33 10 10.02 Valve Installation - Section2018-03-15
33 10 10.03 Valve Installation - Elevation2008-06-02
33 10 10.04 Water Riser & Curb Stop2008-06-02
33 10 10.05 Well Connection Detail2008-06-02
33 30 10BSewer System2018-08-15
33 30 10.01 Precast Manhole2008-06-02
33 30 10.02 Drop Manhole2008-06-02
33 30 10.03 750 mm Catchbasin2008-06-02
33 30 10.04 Manhole Invert on Intersection Less than 90º2008-06-02
33 30 10.05 Server Service Connection2008-06-02
33 30 10.06 Sewer Riser2018-03-15
33 34 05BSanitary Sewage Force Main System2018-08-15
33 34 05.01 Sewage Force Main Flushout2008-06-02
33 46 13BFoundation Drainage2008-06-02
33 50 10BGas Distribution System2008-06-02

Contact

Connect with Technical Services and Procurement Branch:

Phone: 780-422-7456
Fax: 780-422-7479
Email: [email protected]
Email: [email protected]