Rochon Sands Flood Protection Project

Options to help mitigate flood risks along Beach Street East.

Explore pages in:

Overview

The land along Beach Street East, in the Summer Village of Rochon Sands, is at risk of flooding during extreme weather conditions when lake levels are high.

In 2012, when the lake water level was very high, meetings were held with landowners and it was agreed that mitigation measures and emergency access is required.

We aim to find a permanent solution that reflects and addresses community concerns while protecting properties from the potential flood risk.

Project updates

The project team hosted an open house on September 2, 2017 to share the preferred design options.

Read the comments about the project and newsletters.

Beach Street East

2016

Shoreline adjacent to Beach Street East

Looking east along the shoreline adjacent to Beach Street East, 2016

Looking east along Beach Street East, 2016

Looking east along Beach Street East, 2016

2012

Looking east along Beach Street East during high water levels in 2012

Looking east along Beach Street East during high water levels in 2012

Looking east at high water along Beach Street East in 2012

Looking east at high water along Beach Street East in 2012

Contact

Connect with Water Management Section:
Email: [email protected]