Figure No. Figure Description
  Miscellaneous
  Functional Classification - Existing Conditions Map
  Highway Service Classification Map (PDF)
  National Highway System of Alberta Map (PDF)
  Roadside Management Classification Map
  Chapter C
C-6.0 Centreline to Centreline Spacing for New Rural Divided Highways in Alberta
C-9.3.1 Clearance Box for Railway Overpass
C-9.3.2 Minimum Clearance Box for Railway Underpass and Grade Separation
C-9.3.3 Typical Details of Highway Grade Separation for RAD-412.4
C-8.1c Pavement Sideslope at Various Stages of "New Construction" Projects for RFD / RAD 616.6, RFD / RAD 282.4, RAU 283, RAU 282 and RAU 281
C-8.1d Pavement Sideslope at Various Stages of "Widening" Type Projects for RFD / RAD 616.6, RFD/RAD 412.4, RAU 283, RAU 282, and RAU 281
C-8.1e Pavement Sideslope at Various Stages of "New Construction" Projects for RAU / RCU 280, RAU / RCU 209 and RCU 208
C-8.1f Pavement Sideslope at Various Stages of "Widening" Type Projects for RAU / RCU 280, RAU / RCU 209 and RCU 208
C-8.1g Typical Pavement Design for Four-Lane Divided Hwy RFD-412.4-130 & RAD-412.4-120
C-8.2a Standard Cross-Section for Six-Lane Divided Highway RFD / RAD-616.6-130
C-8.2b Standard Cross-Section for Four-Lane Divided Highway RFD-412.4-130 & RAD-412.4-120
C-8.2c Standard Cross-Section for RAU-213-130 / 120
C-8.2d Standard Cross-Section for RAU-212-120 / 110
C-8.2e Standard Cross-Section for RAU-211-110
C-8.2f Standard Cross-Section for RAU-210-110
C-8.2g Standard Cross-Section for RAU / RCU-209-110
C-8.2h Standard Cross-Section for RAU-208-110 / 100
C-8.2i Standard Cross-Section for RCU-208-110 / 100
C-8.2j Standard Cross-Section for RLU-210G-100
C-8.2k Standard Cross-Section for Service Roads RLU-208G-90
C-8.2l Standard Cross-Section for RCU-211L-110
C-8.2m Standard Cross-Section for RCU-208P-80 (Highway Within Provincial Park Boundary)
C-8.2n Standard Cross-Section Through Muskeg or Adjacent to Open Water on 2-Lane Undivided Highways
C-8.2o Standard Cross-Section in Rock Cut on Two-Lane Undivided Highways
C-8.2p Standard Cross-Section Using Modified Subgrade for RAU / RCU-210-110
C-8.2q Standard Cross-Section Using Modified Subgrade for RAU / RCU-209-110
  Chapter E
E.1.1 Design Standards of Exit & Entrance Terminals for Divided Highways at Interchanges
E.1.2 Details of Entrance Terminals on Divided Highways at Interchanges
E.1.3 Details of Exit Terminals on Divided Highways at Interchanges
  Chapter F
F-2.1.1 Typical Safety Rest Area On Existing Divided Highways Stage I (Basic)
F-2.1.2 Typical Safety Rest Area On Existing Divided Highways Stage II
F-2.1.3 Typical Safety Rest Area On Existing Divided Highways Stage III
F-2.1.4 Typical Safety Rest Area On Existing Divided Highways Stage IV
F-2.2.1 Typical Safety Rest Area On Undivided Highways (Future Twinning on Same Side)
F-2.2.2 Typical Safety Rest Area On Undivided Highways (Future Twinning On Opposite Side)
F-2.3.1 Typical Safety Rest Area On Two Lane Highway (20 Year AADT > 3000)
F-2.3.2 Typical Safety Rest Area On Two Lane Highways (20 Year AADT < 3000)
F-2.3.3 F-2.3.3 Typical Safety Rest Area on Two Lane Highways For Log Haul Routes (20 Year AADT < 3000)
F-3.1 Roadside Turnouts for Highload / Wide load Use (Near Point of Origin)
  Chapter G
G-1.1 Suggested Minimum Roadway Width for Rural Highways in Alberta (shown in terms of existing AADT)

Was this page helpful?

All fields are required unless otherwise indicated.

Your submissions are monitored by our web team and are used to help improve the experience on Alberta.ca. If you require a response, please go to our Contact page.

You will not receive a reply. Submissions that include telephone numbers, addresses, or emails will be removed.