ENGINEERING CONSULTANT GUIDELINES FOR HIGHWAY, BRIDGE AND WATER PROJECTS - Volume 1 - 2011
ENGINEERING CONSULTANT GUIDELINES FOR HIGHWAY, BRIDGE AND WATER PROJECTS - Volume 1 - 2002
Any omissions, obvious errors, or recommendations for future updates regarding the above documents should be forwarded to the following email: ECGfeedback@gov.ab.ca
Download Forms
- APPENDIX B - Typical Agenda for Consultant Initialization Meeting
- Consultant Initialization Meeting (doc 34K)– Provincial Highway Project's Agenda
- APPENDIX C - Summary Tables of Commonly Used Forms
- Accident Notification (doc 59K)
- Utility Accident Report (doc 118K)
- All-terrain Vehicles Order (doc 29K)
- Payment Voucher Directions and Completion Guide (doc 127K)
- Design Standards/Practice Exception Request Form (doc 85K)
- APPENDIX D - Planning Requirements
- Basic Right-of-Way Request (doc 41K)
- Right-of-Way Request Form (doc 44K)
- Right-of-Way Process Acquisition Summary (doc 112)
- Sample Correspondence to Stakeholders (doc 28K)
- Sample Survey (doc 31K)
- APPENDIX F - Surfacing Criteria
- Surfacing Estimate Worksheet (doc 57K)
- Surfacing Estimate Schematics (doc 71K)
- Surfacing Estimates Typical (doc 414K)
- Surfacing Estimates (doc 147K)
- Surfacing Estimate Summary (doc 147K)
- Materials Distribution Summary (doc 70K)
- Surfacing Estimate Worksheet (doc 57K)
- APPENDIX G - Supply of Aggregates
- Aggregates Data Summary Request (pdf 41K)
- Aggregates Data Summary Request (Fillable) (xslx 78K)
- APPENDIX H - Utility Adjustment Agreements (Samples)
- Sample 1 (doc 31K) – Letter of Notification
- Sample 2 (doc 33K) - Letter Requesting for Cost Estimate
- Sample 3 (doc 40K) – Letter of Confirmation of Cost Estimate and Signing Agreements
(Telecommunication and Power Company) - Sample 4 (doc 31K) - Letter of Confirmation of Cost Estimate and Signing Agreements (Pipeline Company)
- Sample 5 (doc 54K) – Roadway Upgrading Pipeline Crossing Agreement
(Pipeline Adjustment is required) - Sample 6 (doc 41K) – Roadway Upgrading Pipeline Crossing Agreement
(Pipeline Adjustment is not required) - Sample 7 (doc 90K) – New Roadway over Existing Pipeline Crossing Agreement
- Sample 8 (doc 42K) – Letter of Confirmation of Cost Estimate (New Railway Crossing)
- Sample 9 (doc 42K) - Letter of Confirmation of Cost Estimate (Existing Railway Crossing Upgrading)
- Sample 10 (doc 31K) - Letter of Confirmation of Commencement of Construction
- Sample 11 (doc 35K) - Utility Agreement with ATCO Electric Ltd.
- Sample 12 (doc46K) - Roadway Upgrading Pipeline Crossing Agreement with ATCO Pipeline Ltd. or ATCO Gas Ltd. (with or without Pipeline Adjustment is required)
- APPENDIX I - Sample Cost Estimates and Summary
- "A" Estimate (doc 77K)
- "B" Estimate (doc 298K)
- "C" Estimate (doc 751K)
- "D" Estimate (doc 474K)
- APPENDIX J
- J1 - Bridge Design Processes and Data Requirements
- Process Forms
- Bridge Choose Design (doc 94K)
- Bridge Design Completion (doc 99K)
- Design Project Brief (doc 144K)
- Process Forms
- J1 - Bridge Design Processes and Data Requirements